How the kanban calculator works

The loop has to hold enough parts to cover demand while a container is being replenished. The calculator multiplies demand by the replenishment lead time, adds the safety allowance and divides by the container size.

Rounding up gives whole cards. Authorized stock is the number of cards times the container size, spread across the whole loop, not held at one location. The kanban calculation guide explains each term.

CalculationK = ⌈D × L × (1 + s) / C⌉

D demand per time unit, L replenishment lead time, s safety allowance, C units per container.

Worked example

Load the example. A part is used at 200 units per working hour, replenishment takes 1.5 hours, the team allows 20% extra coverage and containers hold 20 units.

StepCalculationResult
Coverage200 × 1.5 × 1.20360 units
Cards360 ÷ 2018 cards
Lead time 2 hours200 × 2 × 1.20 ÷ 2024 cards

How to read your result

More cards mean more stock and a longer queue in front of the consuming process. If the loop needs many extra cards, the replenishment time is usually the problem. Shorter changeovers and smaller batches shrink the loop; see SMED and Little’s Law.