A machine capability study asks whether one machine can hold a characteristic when other influences are kept steady: consecutive parts, one setup, one material lot, a short run. It reports Cm and Cmk. A process capability study asks whether production holds the characteristic over weeks, with normal changes in people, tools, material, methods and environment. It reports Cp and Cpk, often with Pp and Ppk. Use the machine study for acceptance or buy-off and the process study for production release. Expect the process result to be lower, and check the limits your customer actually requires.
Tell a machine buy-off study from a production capability study.
Calculate Cm and Cmk from a 50-part acceptance run.
Read 1.33 and 1.67 as named customer or company requirements.
Machine and process capability worksheet
CSVIllustrative CNC shaft exampleMachine and process capability worksheet
Two studies, two different questions
A machine study isolates the machine. The team runs consecutive parts in one short run, with one setup, one material lot and one operator, and measures them with a capable gauge. The spread that remains comes mainly from the machine and the measurement.
A process study lets production run as it normally does. Shifts change, tools wear and get replaced, new material lots arrive, and the shop warms up and cools down. Hilti's supplier guideline describes this as the full influence of the 5M factors, the usual grouping of people, machine, material, method and environment.
So the two results should differ. If a process index comes out as high as the machine index, check whether the process sample really covered normal production.
| Question | Machine capability study | Process capability study |
|---|---|---|
| What it asks | Can this machine hold the characteristic under controlled, short-term conditions? | Does production hold it over time, with its normal variation? |
| Typical trigger | New or transferred equipment, machinery updates, initial samples, after long shutdowns | Production release and ongoing verification, after design or material changes |
| Data | Consecutive parts from one short run, commonly 50 | Subgroups spread over days or weeks, for example 25 subgroups of 5 |
| Variation included | Machine and measurement, as far as possible | Machine plus people, tools, material lots, methods and environment |
| Indices | Cm, Cmk | Cp, Cpk and Pp, Ppk |
| Example requirement | Cmk at least 1.67 (BSH sampling leaflet) | Cpk at least 1.33 in series (BSH sampling leaflet) |
Run the machine study under controlled conditions
ISO 22514-3 covers short-term machine performance studies on discrete parts. It assumes consecutively produced parts under repeatability conditions and considers fewer than 30 observations unsuitable. It also excludes runs where tool wear is expected during the study or where observations are autocorrelated.
Customer guidelines usually ask for more parts. BSH's leaflet on sampling sets a minimum of 50 measured parts and says 100 would be better. Hilti's guideline also starts at 50 pieces. Minitab's help describes 20 to 50 consecutive parts from one machine as usual.
Settle the gauge first. Minitab notes that only machine and measurement variation feed Cm and Cmk, so a noisy gauge makes a good machine look worse. Hilti's sequence also puts the gauge study before the short-term study. The Gage R&R guide shows how to check it.
Definitions vary between guidelines. Minitab applies the Cp and Cpk formulas to the machine data. Hilti defines the spread with the 0.135% and 99.865% quantiles, which equals 6σ for a normal distribution. NIST's capability table shows that a tolerance of 8σ corresponds to an index of 1.33 on the 6σ definition. A formula with a different multiplier in the denominator gives different numbers for the same parts, so write the customer's exact formula into the study record.
μm and σm come from the machine run only. Confirm the customer's spread definition before comparing results.
Run the process study under normal production
The process study needs time. Hilti's guideline asks for a period long enough for all influences to act, with 20 production days as a standard value and at least 125 parts in total. BSH's usual scope is n = 5 parts in a row from each of m = 25 representative lots or events, such as shifts, material changes and setups.
Spread the subgroups across the changes you expect: every shift, tool changes, setups and material lots. Plot them on a control chart before you trust a capability number. NIST describes capability as a comparison between an in-control process and its specifications.
Index names differ too. This article follows the Cp and Cpk guide: Cp and Cpk use within-subgroup sigma, Pp and Ppk use overall sigma. Hilti names the indices by study stage and stability instead, and BSH calls its preliminary index Cpk-ST, formerly Ppk. Ask which naming your customer uses before comparing numbers.
Worked example: the machine passes buy-off, the process falls short
Illustrative example, not plant data. A shaft diameter has a tolerance of 10.00 ± 0.05 mm, so LSL = 9.95 mm and USL = 10.05 mm. The fictional customer uses the limits in BSH's leaflet: Cmk of at least 1.67 for the machine and Cpk of at least 1.33 in series. A new CNC lathe runs 50 consecutive parts at buy-off, with one setup, one bar lot and a fresh tool.
The machine run gives a mean of 10.004 mm and σm = 0.008 mm. Cm = 0.10 / 0.048 = 2.08. The upper limit is nearer, 0.046 mm away, so Cmk = 0.046 / 0.024 = 1.92. Against the customer's 1.67, the machine passes.
Four weeks of production follow, sampled as 25 subgroups of 5 parts across shifts, tool changes and three material lots. The mean has moved to 10.008 mm. Within-subgroup sigma is 0.011 mm and overall sigma is 0.015 mm.
Cp = 0.10 / 0.066 = 1.52 and Cpk = 0.042 / 0.033 = 1.27. Pp = 0.10 / 0.090 = 1.11 and Ppk = 0.042 / 0.045 = 0.93. Against the customer's 1.33, the process does not qualify yet, although the same machine passed its acceptance study.
Stability has not been shown here. A gap this size between within and overall sigma suggests some subgroup means would fall outside X-bar control limits, so treat the within-based Cpk as conditional. The verdict does not change, because the overall-based Ppk is lower still.
| Study | Mean (mm) | Sigma (mm) | Spread index | Location index |
|---|---|---|---|---|
| Machine, 50 consecutive parts | 10.004 | 0.008 | Cm 2.08 | Cmk 1.92 |
| Process, within-subgroup sigma | 10.008 | 0.011 | Cp 1.52 | Cpk 1.27 |
| Process, overall sigma | 10.008 | 0.015 | Pp 1.11 | Ppk 0.93 |
Read 1.33 and 1.67 as someone's requirement
No single limit applies everywhere. The customer, an industry guideline or your own quality system sets it, and it often depends on how important the characteristic is.
BSH's leaflet on sampling usually expects Cmk of at least 1.67 from 50 parts, a preliminary Cpk-ST of at least 1.67 at the start, and Cpk of at least 1.33 in series production. Minitab's help notes that many industries use 1.67 as the machine benchmark and that it is usually higher than the process benchmark.
Hilti's 2015 supplier guideline grades its limits by feature class, as the table shows. The example's Cpk of 1.27 would clear a 1.00 limit and miss a 1.33 limit. Always name the document behind the number.
The machine limit is usually the higher one because the short run leaves out most production variation. The extra margin is there for the influences that the process study adds later.
A Cp below 1 means the tolerance is narrower than six process sigmas. NIST's table shows that a centred, stable, normal process at Cp = 1.00 puts about 0.27% of parts outside the limits. Below 1, out-of-tolerance parts are expected even with perfect centring, so reduce the spread before you adjust the mean.
| Source | Machine study | Process study |
|---|---|---|
| BSH leaflet on sampling | Cmk ≥ 1.67, usually from 50 parts | Cpk-ST ≥ 1.67 at start; Cpk ≥ 1.33 in series |
| Hilti guideline, H and N features | Cm ≥ 1.67, Cmk ≥ 1.33 | Pp and Cp ≥ 1.33, Ppk and Cpk ≥ 1.00 |
| Hilti guideline, K features | Cm ≥ 2.00, Cmk ≥ 1.67 | Pp and Cp ≥ 1.67, Ppk and Cpk ≥ 1.33 |
When the machine passes and the process does not
Use the gap between the two studies to direct the investigation. The machine study showed what the equipment can do under controlled conditions. The extra variation entered somewhere in production.
Repeat the machine study when the machine situation changes. Hilti's guideline lists a transfer to another plant, a machinery update, an extended shutdown, a design change and a new raw material among the reasons for a new short-term study.
- Confirm the measurement
Check that both studies used the same gauge, method and fixture.
- Plot production data in time order
Look for shifts at tool changes, setups, shift handovers or material lots.
- Compare within and overall sigma
A large gap points to differences between subgroups rather than the machine's own repeatability.
- Test the suspected source
Change one influence at a time, such as the tool change interval or the offset routine, and record the result.
- Repeat the process study
Collect a fresh sample over a comparable period before claiming the requirement is met.
A related example from Abolfazl
Compare the capability formulas and their assumptions in another worked example.
In English, on founder Abolfazl’s personal blog. This is related reading, not an independent technical source.
Practical checklist
- Name the characteristic, tolerance and drawing revision.
- Confirm the gauge study before either capability study.
- Record the formula and spread definition the customer requires.
- Run the machine study on consecutive parts, without tool changes or expected wear.
- Spread process subgroups across shifts, tools and material lots.
- Check stability on a control chart before reporting Cpk.
- Compare each result with a named customer or company limit.
- Repeat both studies after a change to the machine, tooling, method or material.
FAQ
FAQ
Sources and further reading
Authoritative references used to research and verify this guide.
- ISOISO 22514-3:2020, capability and performance, part 3: machine performance studies for measured data on discrete parts
- NIST/SEMATECH e-Handbook of Statistical Methods6.1.6. What is Process Capability?
- Minitab SupportWhat are Cm and Cmk?
- HiltiQuality capability statistics for suppliers (supplier guideline SCM-1.3-GL4, 2015)
- BSH Hausgeräte GmbHLeaflet on Sampling