Short answer

A machine capability study asks whether one machine can hold a characteristic when other influences are kept steady: consecutive parts, one setup, one material lot, a short run. It reports Cm and Cmk. A process capability study asks whether production holds the characteristic over weeks, with normal changes in people, tools, material, methods and environment. It reports Cp and Cpk, often with Pp and Ppk. Use the machine study for acceptance or buy-off and the process study for production release. Expect the process result to be lower, and check the limits your customer actually requires.

Key takeaways

Tell a machine buy-off study from a production capability study.

Calculate Cm and Cmk from a 50-part acceptance run.

Read 1.33 and 1.67 as named customer or company requirements.

CSVBlank study record

Machine and process capability worksheet

CSVIllustrative CNC shaft example

Machine and process capability worksheet

Two studies, two different questions

A machine study isolates the machine. The team runs consecutive parts in one short run, with one setup, one material lot and one operator, and measures them with a capable gauge. The spread that remains comes mainly from the machine and the measurement.

A process study lets production run as it normally does. Shifts change, tools wear and get replaced, new material lots arrive, and the shop warms up and cools down. Hilti's supplier guideline describes this as the full influence of the 5M factors, the usual grouping of people, machine, material, method and environment.

So the two results should differ. If a process index comes out as high as the machine index, check whether the process sample really covered normal production.

QuestionMachine capability studyProcess capability study
What it asksCan this machine hold the characteristic under controlled, short-term conditions?Does production hold it over time, with its normal variation?
Typical triggerNew or transferred equipment, machinery updates, initial samples, after long shutdownsProduction release and ongoing verification, after design or material changes
DataConsecutive parts from one short run, commonly 50Subgroups spread over days or weeks, for example 25 subgroups of 5
Variation includedMachine and measurement, as far as possibleMachine plus people, tools, material lots, methods and environment
IndicesCm, CmkCp, Cpk and Pp, Ppk
Example requirementCmk at least 1.67 (BSH sampling leaflet)Cpk at least 1.33 in series (BSH sampling leaflet)

Run the machine study under controlled conditions

ISO 22514-3 covers short-term machine performance studies on discrete parts. It assumes consecutively produced parts under repeatability conditions and considers fewer than 30 observations unsuitable. It also excludes runs where tool wear is expected during the study or where observations are autocorrelated.

Customer guidelines usually ask for more parts. BSH's leaflet on sampling sets a minimum of 50 measured parts and says 100 would be better. Hilti's guideline also starts at 50 pieces. Minitab's help describes 20 to 50 consecutive parts from one machine as usual.

Settle the gauge first. Minitab notes that only machine and measurement variation feed Cm and Cmk, so a noisy gauge makes a good machine look worse. Hilti's sequence also puts the gauge study before the short-term study. The Gage R&R guide shows how to check it.

Definitions vary between guidelines. Minitab applies the Cp and Cpk formulas to the machine data. Hilti defines the spread with the 0.135% and 99.865% quantiles, which equals 6σ for a normal distribution. NIST's capability table shows that a tolerance of 8σ corresponds to an index of 1.33 on the 6σ definition. A formula with a different multiplier in the denominator gives different numbers for the same parts, so write the customer's exact formula into the study record.

Machine capability indices (6σ definition)Cm = (USL − LSL) / (6σm); Cmk = min(USL − μm, μm − LSL) / (3σm)

μm and σm come from the machine run only. Confirm the customer's spread definition before comparing results.

Run the process study under normal production

The process study needs time. Hilti's guideline asks for a period long enough for all influences to act, with 20 production days as a standard value and at least 125 parts in total. BSH's usual scope is n = 5 parts in a row from each of m = 25 representative lots or events, such as shifts, material changes and setups.

Spread the subgroups across the changes you expect: every shift, tool changes, setups and material lots. Plot them on a control chart before you trust a capability number. NIST describes capability as a comparison between an in-control process and its specifications.

Index names differ too. This article follows the Cp and Cpk guide: Cp and Cpk use within-subgroup sigma, Pp and Ppk use overall sigma. Hilti names the indices by study stage and stability instead, and BSH calls its preliminary index Cpk-ST, formerly Ppk. Ask which naming your customer uses before comparing numbers.

Worked example: the machine passes buy-off, the process falls short

Illustrative example, not plant data. A shaft diameter has a tolerance of 10.00 ± 0.05 mm, so LSL = 9.95 mm and USL = 10.05 mm. The fictional customer uses the limits in BSH's leaflet: Cmk of at least 1.67 for the machine and Cpk of at least 1.33 in series. A new CNC lathe runs 50 consecutive parts at buy-off, with one setup, one bar lot and a fresh tool.

The machine run gives a mean of 10.004 mm and σm = 0.008 mm. Cm = 0.10 / 0.048 = 2.08. The upper limit is nearer, 0.046 mm away, so Cmk = 0.046 / 0.024 = 1.92. Against the customer's 1.67, the machine passes.

Four weeks of production follow, sampled as 25 subgroups of 5 parts across shifts, tool changes and three material lots. The mean has moved to 10.008 mm. Within-subgroup sigma is 0.011 mm and overall sigma is 0.015 mm.

Cp = 0.10 / 0.066 = 1.52 and Cpk = 0.042 / 0.033 = 1.27. Pp = 0.10 / 0.090 = 1.11 and Ppk = 0.042 / 0.045 = 0.93. Against the customer's 1.33, the process does not qualify yet, although the same machine passed its acceptance study.

Stability has not been shown here. A gap this size between within and overall sigma suggests some subgroup means would fall outside X-bar control limits, so treat the within-based Cpk as conditional. The verdict does not change, because the overall-based Ppk is lower still.

Two bell curves inside a tolerance band from 9.95 to 10.05 mm. The narrow machine curve spans 9.980 to 10.028 mm around a mean of 10.004 mm. The wider process curve spans 9.963 to 10.053 mm around 10.008 mm, and its upper tail crosses the upper limit.
Illustrative example. Machine ±3σ band (σ = 0.008 mm) and process overall ±3σ band (σ = 0.015 mm) drawn against the same 10.00 ± 0.05 mm tolerance.
StudyMean (mm)Sigma (mm)Spread indexLocation index
Machine, 50 consecutive parts10.0040.008Cm 2.08Cmk 1.92
Process, within-subgroup sigma10.0080.011Cp 1.52Cpk 1.27
Process, overall sigma10.0080.015Pp 1.11Ppk 0.93

Read 1.33 and 1.67 as someone's requirement

No single limit applies everywhere. The customer, an industry guideline or your own quality system sets it, and it often depends on how important the characteristic is.

BSH's leaflet on sampling usually expects Cmk of at least 1.67 from 50 parts, a preliminary Cpk-ST of at least 1.67 at the start, and Cpk of at least 1.33 in series production. Minitab's help notes that many industries use 1.67 as the machine benchmark and that it is usually higher than the process benchmark.

Hilti's 2015 supplier guideline grades its limits by feature class, as the table shows. The example's Cpk of 1.27 would clear a 1.00 limit and miss a 1.33 limit. Always name the document behind the number.

The machine limit is usually the higher one because the short run leaves out most production variation. The extra margin is there for the influences that the process study adds later.

A Cp below 1 means the tolerance is narrower than six process sigmas. NIST's table shows that a centred, stable, normal process at Cp = 1.00 puts about 0.27% of parts outside the limits. Below 1, out-of-tolerance parts are expected even with perfect centring, so reduce the spread before you adjust the mean.

SourceMachine studyProcess study
BSH leaflet on samplingCmk ≥ 1.67, usually from 50 partsCpk-ST ≥ 1.67 at start; Cpk ≥ 1.33 in series
Hilti guideline, H and N featuresCm ≥ 1.67, Cmk ≥ 1.33Pp and Cp ≥ 1.33, Ppk and Cpk ≥ 1.00
Hilti guideline, K featuresCm ≥ 2.00, Cmk ≥ 1.67Pp and Cp ≥ 1.67, Ppk and Cpk ≥ 1.33

When the machine passes and the process does not

Use the gap between the two studies to direct the investigation. The machine study showed what the equipment can do under controlled conditions. The extra variation entered somewhere in production.

Repeat the machine study when the machine situation changes. Hilti's guideline lists a transfer to another plant, a machinery update, an extended shutdown, a design change and a new raw material among the reasons for a new short-term study.

  1. Confirm the measurement

    Check that both studies used the same gauge, method and fixture.

  2. Plot production data in time order

    Look for shifts at tool changes, setups, shift handovers or material lots.

  3. Compare within and overall sigma

    A large gap points to differences between subgroups rather than the machine's own repeatability.

  4. Test the suspected source

    Change one influence at a time, such as the tool change interval or the offset routine, and record the result.

  5. Repeat the process study

    Collect a fresh sample over a comparable period before claiming the requirement is met.

A related example from Abolfazl

Compare the capability formulas and their assumptions in another worked example.

Read the companion note

In English, on founder Abolfazl’s personal blog. This is related reading, not an independent technical source.

Practical checklist

  • Name the characteristic, tolerance and drawing revision.
  • Confirm the gauge study before either capability study.
  • Record the formula and spread definition the customer requires.
  • Run the machine study on consecutive parts, without tool changes or expected wear.
  • Spread process subgroups across shifts, tools and material lots.
  • Check stability on a control chart before reporting Cpk.
  • Compare each result with a named customer or company limit.
  • Repeat both studies after a change to the machine, tooling, method or material.

FAQ

FAQ

Sources and further reading

Authoritative references used to research and verify this guide.